Pungwe C
Zimbabwe, Africa
Full Water to wire package with installation & commissioning
KEY STATS
- Commissioned: 2016
- Power: 4.3 MW
- Net Head: 180 m
- Flow: 3000 l/s
- Turbine: 28" Twin Jet Turgo