Pungwe Hydro
Zimbabwe, Africa
Full Water to wire package with installation & commissioning
KEY STATS
- Commissioned: 2012
- Power: 2.1MW
- Net Head: 312 M
- Flow: 1000 l/s
- Turbine: 950mm Twin Jet Pelton
Zimbabwe, Africa
Full Water to wire package with installation & commissioning