Long Banga Hydro Scheme

Sarawak, Malaysia

The small village of Long Banga is located in Sarawak, Malaysia close to the border with Kalimantan. Such is its remoteness that mains electricity supply is not practical. Residents generated electricity using small diesel generators run when required but the supply was not constant or reliable and relied on fuel that was transported over long distances. Long Banga was identified as an ideal location to install a Mini Hydro scheme to provide 24 hour electricity for residents.

The sediment laden River Banga is an ideal site for the Gilkes Turgo Turbine. Gilkes supplied two 12” twin jet high capacity Turgo impulse turbines. These were coupled to synchronous generators with flywheels to provide improved speed stability. Actuation was provided by a hydraulic control module for each turbine. The system is designed for the turbines to run in a duty and standby arrangement. Synchronising equipment is included in the control panel for paralleling to a grid in the future.

The system has been designed to black start with an operator hand pumping the hydraulic system. Once online each individual turbine can provide up to 160kW of electrical power. Speed regulation is carried out by deflector governing which provides stable speed regulation with the ability to accept significant loads with minimal drop in frequency. Commissioning was completed in May 2014 and the villagers of Long Banga are now able to enjoy a reliable 24 hour a day supply of electrcity.

SCOPE OF SUPPLY

  • 12" TJ HCTI Turgo Impulse Turbine & Flywheel
  • Hydraulic Control Module
  • MIV and Bypass
  • PLC Control System & Digital Governor
  • Syncronous Generator
Download full case study download

Key Stats

  • Commissioned May 2014
  • Power 330 kW
  • Net Head 148 m
  • Flow 145 l/s
  • Turbine Type 2 Twin Jet Turgo